
Title
Barnstead
Thermolyne
NANOpure® DIamond™
Ultrapure Water System
Installation/Operation
Qualification
Protocol
BT.001.01.A
Customer
Protocol
____________
Revision
0
Customer
Revision
____________
Equipment ID
NANOpure®
DIamond™
Ultrapure
Water
System 1
Customer
____________
____________
____________
____________
____________
BT.001.01.A
09262000 Page 17 of 21
3Normal
Operation
Continued
“Enter”
Modify set point with up- and
down-arrow if necessary and press
Enter.
Document the programmed
setpoint.
_______M
Ω
-cm
4
Pressure or Float
Switch (optional)
Reduce inlet water pressure and/or
volume.
Verify that pump shuts down and
displays “Check Inlet”.
Y N
5
Controller Maintains resistivity above
programmed set point.
Y N
6 Power Failure
Recovery
Press BACK key two times to return
to IDLE mode.
Turn main circuit breaker for
DIamond(tm) off and then back on
to simulate a power failure
followed by a restoration of power.
Verify that the controller returns to
normal operation upon restoration
of power by depressing the
START/STOP button.
Y N
Discrepancies/ List all discrepancies between specifications and
Kommentare zu diesen Handbüchern