
Title
Barnstead
Thermolyne
NANOpure® DIamond™
Ultrapure Water System
Installation/Operation
Qualification
Protocol
BT.001.01.A
Customer
Protocol
____________
Revision
0
Customer
Revision
____________
Equipment ID
NANOpure®
DIamond™
Ultrapure
Water
System 1
Customer
____________
____________
____________
____________
____________
BT.001.01.A
09262000 Page 7 of 21
A. Installation Qualification
Step Description Specification or Acceptance
Criteria
Actual Result
1 Unit Location/
Installation
Is the NANOpure
DIamond™
Ultrapure Water System located on
a level surface or securely wall-
mounted?
Has the minimum clearance,
9”(23cm) each sides, 3” (8cm)on
top, 4.75” (12cm)in front been
provided?
Is unit mounted away from
electrical equipment or
combustible materials?
Has the water inlet piping
connection been made?
Has a manual shutoff valve been
installed between the main water
supply and the NANOpure
DIamond™ Ultrapure Water
System?
Y N
Y N
Y N
Y N
Y N
Kommentare zu diesen Handbüchern